Pune Metro expedites station development: Range Hills and other stations tender launched

  • Preparation of subgrade, GSB, WMM laying & levelling with compaction.
  • Street level development includes paver block, kerb stone, bus bay, drop off bay etc.
  • Civil work of escalator pit, staircase & PEB, roof sheeting works of escalator pit, staircase
  • Connecting FOB with deck slab & PEB from EE03 to station box median RCC pier.
  • RCC pier at median of station box to support connecting FOB from EE03 to station box.
  • Architectural façade work at entrance lobby and FOB including top & bottom solid band.
  • Floor granite, tactile, highlighter, dry wall cladding, SS railing fixing etc.
  • Construction of service shaft in MS subframe & ACP, Cable tray & fire line MS support
  • Any other miscellaneous works assigned by Maha-Metro.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *



Next Story